Sustainability

Mobility and synergies

The Prime Tower Site is located centrally in Zurich's vibrant District 5 and is a popular place for meeting and interaction. Short distances and the best connections are guaranteed.

Electric charging stations in the underground parking garage

On the first and second basement levels of the underground parking garage, there are 22 parking spaces each equipped with an E-mobility infrastructure. The charging solutions are modular and can be expanded at any time.

Bicycle parking spaces

There are several bicycle parking facilities at the Prime Tower Site, which are available to tenants as well as the public. Additional bicycle parking spaces are located below and on the Hardbrücke.

Hardbrücke train station

With direct access to the Hardbrücke train station, the Prime Tower Site offers an optimal connectivity to public transportation. Commuters benefit from numerous S-Bahn connections to Zurich main station, Zurich Airport and Aarau throughout the day, from early morning until late at night.

Energy efficiency

In line with Swiss Prime Site's sustainability strategy, the Prime Tower Site is designed for energy efficiency. A large part of the general electricity demand is covered by solar energy.

Certifications

The Prime Tower has received several awards as a sustainable building: it meets the Minergie standard and has been awarded LEED Gold status.